Radiant Barrier

Post Frame New Construction Ceiling Installation

CEILING INSTALLATION

Stretch the Tempshield® Reflective Insulation over the purlins, using double-sided tape to hold the material in place.

Place the corrugated roof panel over the Tempshield® Reflective Insulation and attach to the metal with a self-tapping screw.

Overlap the Tempshield® Reflective Insulation by 3-6 inches and repeat.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare
Need Help? Call Now